Projects Detail

Maelezo ya Mradi

  • Jina la mradi: KIKONGE MULTIPURPOSE DAM, HYDROPOWER AND IRRIGATION PROJECT (300MW):
  • Wakala wa Utekelezaji: Tanzania Electric Supply Company Limited (TANESCO)
  • Gharama ElekeziThe estimated project cost is USD 750 Million
  • Status: feasibility study
  • Sector: Energy

SHORT DESCRIPTION

Construction of Multipurpose Dam, HPP and its 220kV double circuit transmission line of about 97km to Madaba substation.